ICL Group Project 

Anvil Engineering completed the design for its new North American Blending operation at its plant in St. Louis, MO. in 2016. The building is a 45’ X 60’ X 60’ high chemical processing building constructed from structural steel and insulated metal panels (IMP’s). The facility was designed in a fast track nature in order to allow startup of the facility at the earliest possible timeframe.

 


PROJECT HIGHLIGHTS

​

  • Building designed to Class 2 Div 2 combustible dust standards

  • Structural as well as architectural design completed 

  • Building process equipment design included: 8,000lb blender, packer, hoppers, sifters, screeners, and wrapper

  • Coordinated all MEP design and construction activities